Ambiens most often supports renewable energy projects delivered by developers, investors, and financing institutions. In this case, however, the cooperation involved a distinctive industrial client — a zinc producer, ZGH “Bolesław” S.A. — planning a wind farm combined with a photovoltaic installation in a hybrid configuration.

In 2025, Ambiens delivered a package of studies for the planned wind farm and PV installation in the Małopolskie region. The scope included site assessment (environmental, legal, technical, and spatial conditions), investment layout planning (wind turbine micrositing and PV configuration), and assessment of the wind farm’s impact on key environmental components relevant for EIA and SEA procedures. Ambiens also supported the decision‑making process and stakeholder dialogue, actively participating in substantive discussions throughout the project.

This project illustrates how renewable energy is increasingly being analysed and implemented outside the traditional developer market — as a solution directly considered by industrial actors. Ambiens focuses on delivering advisory services that genuinely support investment decisions through reliable assessment of conditions, conscious risk mapping, and identification of practical, implementable solutions.

ZGH “Bolesław” mining and metallurgical plant in Bukowno near Olkusz. Author: Ufoizba, source: Wikimedia Commons, license: CC BY-SA 3.0.

Categories:

Tags: