We have just completed the site assessment of about 300 hectares for a hybrid power plant based on the principle of cable pooling. On the positively verified area, a multi-criteria analysis has developed a preliminary layout for wind turbines and photovoltaics. This is the basis for further permitting and foundation of key interfaces management at an early stage of development. 