Skip to content
  • Who are we?
  • Competences
  • People
  • Insights
  • Contact
  • Polski
Ambiens
  • Who are we?
  • Competences
  • People
  • Insights
  • Contact
  • Polski

Posts in Ambiens

by Ambiens
March 1, 2009

Base Transceiver Station | Kielce, Katowice | PTC Sp. z o. o.

Today the execution of the order encompassing the preparation of the required environmental documents for another base transceiver station for mobile network (BTS) was completed. The planned project, comprising the construction of BTS in Kielce (Świętokrzyskie Voivodeship), encompasses the installation of TriBand aerials (GSM/DCS/UMTS) and the installation of three parabolic aerials (radio base station aerials).

0
read more
by Ambiens
February 2, 2009

Base Transceiver Station | Jaworzno | PTC Sp. z o. o.

The execution of a non-standard order for one of our key Business Partners was completed. The planned enterprise consisting in the construction of a base transceiver station in Jaworzno, required optimization of its technical parameters from the environmental perspective. The guidelines obtained in the detailed environmental expertise recommended by Ambiens were approved by the Operator.

0
read more
by Ambiens
February 1, 2009

Base Transceiver Station | Częstochowa | PTC Sp. z o. o.

The execution of the order for one of our key Business Partner was completed today. The order encompassed the preparation of the set of environmental assessments for a planned base transceiver station of mobile network (GSM, DCS, UMTS), i.e. the Qualification Assessments and The report on the impact of the base transceiver station on the environment.

0
read more
by Ambiens
November 2, 2008

Base Transceiver Station | Częstochowa | PTC Sp. z o. o.

The execution of the order for one of our key Business Partners services for the benefit of PTC ERA Sp. z o.o. was completed providing. The analyzed enterprise consisted in the expansion of the base transceiver station of a mobile network (assembly of a new sector aerials of DualBand GSM/UMTS) located on an office building roof in Częstochowa execution the following were prepared: the Qualification Assessment (qualification of the project from the perspective of the possible need to obtain a decision on environmental conditions of the approval of the project) and The report on the impact of the base transceiver station on the environment.

0
read more
by Ambiens
November 1, 2008

Changes in Ambiens.pl website

There are some changes to our company website. Among other things we have added the tag “Career” and the section “News”, aimed at updating on our cooperation with Business Partners.

0
read more

Posts navigation

Previous

Posts navigation

Page 1 … Page 36 Page 37 Page 38
Latest insights
  • Ambiens at the 5th EOU Fledglings Meeting in Gdańsk
  • New bat species in Poland and their importance for surveys at wind farms
  • Quiet please! – do not disturb! Protection zones
  • Pre-construction environmental surveys in the area of planned wind farms
  • Renewable Energy for Industry: Advisory Beyond the Developer Model
Categories
  • blog
  • news

advisory Ambiens Ambiens Team analiza hałasu ankieta badania ASER aspekty lokalizacyjne aspekty prawne Bartosz Sobocinski bats BEIF biogazownia chiropterofauna chiropterologia DD decyzja środ decyzja środowiskowa drony due diligence Due dilligence EIA EIA procedure energetyka wiatrowa environmental decision ESDD farma wiatrowa floating offshore floating wind fotowoltaika gaz gazociąg greenfield harborporpoise ichthyofauna karta informacyjna przedsięwzięcia Kinga Dobosz konferencje konsultacje społeczne linie elektroenergetyczne location 10H M&A macrozoobenthos marine mammals micrositing migratory birds monitoring monitoring porealizacyjny monitoring śmiertelności morskie farmy wiatrowe news oddziaływanie wiatraków offshore offshorewind onshore wind oos ornitologia outsourcing OWF permitting perspektywy rozwoju photovoltaic photovoltaics phytobenthos pomiary hałasu poznajmy się procedura ooś procedura sooś proces inwestycyjny prognoza PSEW PV PZP POM raport ooś RES seabirds seamammals site assessment strategy studium wykonalności Tomasz Fajfer ustawa ooś wind wind energy wind farm

Let's navigate together

© 2026 Ambiens.